Design and construct a 5MG water reservoir for Anchorage Water and Wastewater Utility. GMC teamed with DOWL HKM, DN Tanks and Alaska Mechanical, Inc. to construct a 5MG concrete reservoir and control building. GMC acted as general contractor and was responsible for self performing all civil work including pipe connections between the control building and the water main in Elmore Road and the reservoir. Also completed a stormwater collection system to collect site runoff and overflow from the reservoir and all site grading.