Wasilla Garden Terrace Water Main Extension

6,000 l/f of 12″ water main, job included maintaining traffic on Fairview Loop, Garden Terrace Subdivision. An 80 l/ft 30″ bore under the Alaska Railroad tracks required deep trenching techniques and dewatering 24/7 for 30 days.